·¬ÇÑÉçÇø

Brightspot CMS User Guide

Updating in-progress revisions


You can update a revision prior to its publication. If you want to issue a new revision to one that is already published, see Creating a revision.

To update an in-progress revision:

  1. Search for and open the asset in the content edit page.
  2. In the side toolbar, open the Version History widget, and click the revision you want to update. (In versions prior to v4.8, this widget is named the Revisions widget). Brightspot loads the revision in the content edit form.
  3. In the content edit form, modify the revision. As you save the revision, you can compare it with the currently live version by clicking Compare to Live.
  4. Complete your site's workflow and publish the asset.
Previous Topic
Deleting a revision or a draft
Next Topic
Comparing a revision to live version
Was this topic helpful?
Thanks for your feedback.
Our robust, flexible Design System provides hundreds of pre-built components you can use to build the presentation layer of your dreams.

•
•
•
Brightspot is packaged with content types that get you up and running in a matter of days, including assets, modules and landing pages.

• Content types
• Modules
• Landing pages
Everything you need to know when creating, managing, and administering content within Brightspot CMS.

• Dashboards
• Publishing
• Workflows
• Admin configurations
A guide for installing, supporting, extending, modifying and administering code on the Brightspot platform.

• Field types
• Content modeling
• Rich-text elements
• Images
A guide to configuring Brightspot's library of integrations, including pre-built options and developer-configured extensions.

• Google Analytics
• Shopify
• Apple News