·¬ÇÑÉçÇø

Brightspot CMS User Guide

Entering and exiting the bulk schedule feature


Once a bulk schedule is created, you may need to enter that schedule to view its contents or make changes. You might also want to work on some assets and directly add them to a bulk schedule via the bulk-scheduling mode.

For details on how to create a bulk schedule, see Creating a bulk schedule.

Note
In order to use the bulk scheduling feature, you must first have the Scheduled Events widget present on your dashboard.

For information on adding widgets to dashboard, see Creating a shared dashboard and Creating a one-off dashboard.


To enter and exit an existing bulk schedule:

There are two ways to enter an existing bulk schedule, and both require using Scheduled Events widget. See the image below.

Bulk schedules ways to enter a bulk schedule.jpg Bulk schedules ways to enter a bulk schedule.jpg
Both ways to enter a bulk-schedule highlighted

  • To enter the bulk schedule, do one of the following:
    • Click View All. From the Available Schedules pop-up window that opens, click the name of the bulk schedule you want to enter. This opens the Edit Schedule pop-up where you can make changes to the bulk schedule. See Editing or Deleting Bulk Schedules for more information.
      Bulk schedule available schedules pop up.jpg Bulk schedule available schedules pop up.jpg
      Available Schedules pop-up
    • Navigate to the day the bulk schedule is scheduled to be published, and click the name of the bulk schedule to open the Edit Schedule pop-up.
      Bulk scheduling edit schedule pop up.jpg Bulk scheduling edit schedule pop up.jpg
      Edit Schedule pop-up


To exit the bulk schedule, click the close in the upper-right corner of the Edit Schedule pop-up.

To enter bulk-scheduling mode:

  1. Using either of the methods outlined above, open the Edit Schedule pop-up for an existing bulk schedule.
  2. Click Start Scheduling, as seen in the image above.

    Once you click Start Scheduling, the Edit Schedule pop-up closes and the yellow bulk-scheduling banner appears at the top of the page. This signifies that you are in bulk-scheduling mode. When you create or modify an asset, the Publish button is replaced by the Schedule button. As you work on these assets and click Schedule, they are added to the bulk schedule you entered.

    Bulk scheduling banner.jpg Bulk scheduling banner.jpg
    Bulk-scheduling mode banner and Schedule button highlighted

  3. When you are done adding assets to the bulk schedule, click Stop Scheduling in the bulk-scheduling banner. This exits bulk-scheduling mode and returns you to normal publishing.
Note
While in bulk-scheduling mode, you can also click the name of the bulk schedule in the banner to open the Edit Schedule pop-up to make changes to the bulk schedule.

Previous Topic
Creating a bulk schedule
Next Topic
Exiting a bulk schedule
Was this topic helpful?
Thanks for your feedback.
Our robust, flexible Design System provides hundreds of pre-built components you can use to build the presentation layer of your dreams.

•
•
•
Brightspot is packaged with content types that get you up and running in a matter of days, including assets, modules and landing pages.

• Content types
• Modules
• Landing pages
Everything you need to know when creating, managing, and administering content within Brightspot CMS.

• Dashboards
• Publishing
• Workflows
• Admin configurations
A guide for installing, supporting, extending, modifying and administering code on the Brightspot platform.

• Field types
• Content modeling
• Rich-text elements
• Images
A guide to configuring Brightspot's library of integrations, including pre-built options and developer-configured extensions.

• Google Analytics
• Shopify
• Apple News